Update #2

Today is 3 weeks since my surgery.

I am slow moving trying to get my energy back again but not overdoing it.

It is hot here so 90% of my walking is indoor at this point. I go out early a.m. or later p.m.

The Livingston house update is slow and steady.

The framers are supposed to be there this week.

The people doing the front gable porch and the back lean too porch will be getting started soon. The concrete area for the porches is 12ft x 40 ft so the lean too back porch will be that size. The gable front porch will be 10ft each side of the front door and 12 ft out.

They will also custom build my island I am just trying to decide on 8ft or 9ft long.

Website Built with WordPress.com.

Up ↑